Specifications

  • Construction Specifications Project Management

    Construction Specifications Project Management

    In the Standard Specifications October 2023 you'll find information on operations, materials, and excavation.

    • 1" Service Connection
    • 1 1/2 " Service Connection
    • Typical Meter Box Locations
    • Gate Valve Assembly and Marker Post
    • Thrust Restraint-Thrust Block Details
    • Trench Sections
    • Fire Hydrant Assembly
    • 1" or 2" combination Air Valve
    • 1" air/Vacuum Valve
    • Blow-Off Assembly
    • Pip Crossing Assembly
    • Trench Dam
    • End of Line Anchor
    • Fire Service Connection
    • Reduced Pressure BACKFLOW Preventer Assembly
    • Bollard Detail
    • Fired Hydrant Retaining Wall
    • 1" Sampling Station
    • Traffic Control Plan
    • Water Pollution Prevention Plan
    • Project Close Out
    • Trench Excavation, Bedding, and Backfill
    • Paving, Restoration and Resurfacing Work
    • Cast in Place Concrete Structures
    • Piping
    • Valves and Appurtenances

    Click here to download (PDF)