Rates and Fees

Rates

The following rates are in effect as of January 1, 2023:

Tier Monthly Use (ccf) Rate
Tier 1 1-10 $6.64
Tier 2 11-29 $8.79
Tier 3 30-58 $12.30
Tier 4 >59 $15.85
Institutional $14.19

Monthly Readiness to Serve Charges

The following rates are in effect as of January 1, 2023:

Meter Size Rate
¾” $35.08
1” $45.76
1 ½” $72.48
2” $104.54
3” $179.35
4” $286.22

Facility Charges

Facility Charge Meter Size Rate
Storage Fees New 1 in. $6,996
Storage Fees New 1 ½ in. $13,993
Storage Fees New 2 inc. $22,389
Storage Fees New 3 in. $44,777
Storage Fees New 4 in. $69,964
Transmission Fees 1 in. $10,153
Transmission Fees 1 ½ in. $20,306
Transmission Fees 2 in. $32,489
Transmission Fees 3 in. $64,978
Transmission Fees 4 in. $101,528

Installation Charges

Installation Charge Meter Size Rate
Meter Installation ¾ in. $350
Meter Installation 1 in. $400
Meter Installation 1 ½ in. $750
Meter Installation 2 in. $1000
Meter Installation 3 in. Actual Cost
Meter Installation 4 in. Actual Cost
Service Line Installation 1 - 4 in. Actual Cost
Fire Hydrant Installation -- Actual Cost
Backflow Installation 1 in. $2,700
Backflow Installation 1 ½ in. $3,500
Backflow Installation 2 in. $4,200
Construction Inspection -- 10% of contract
Plan Check -- $50
Plan Check Hydraulic Analysis -- $550
RP Bags 1 – 2 in. Actual Cost