Rates

The following rates are in effect as of January 1, 2026:

Tier Monthly Use (ccf) Rate
Tier 1 1-10 $8.47
Tier 2 11-29 $11.26
Tier 3 30-58 $15.81
Tier 4 59 + $20.40
Institutional $18.25

Monthly Readiness to Serve Charges

The following rates are in effect as of January 1, 2026:

Meter Size Rate
¾” $45.42
1” $59.26
1 ½” $93.86
2” $135.38
3” $232.26
4” $370.66

Miscellaneous Fees

Name Fee
Returned Check Fee $64
Reconnection Fee $126
Reconnection Fee (after hours) $558
Reestablish Credit Fee $200
Backflow Testing Fee $188
Meter Testing Fee
Will Serve Letter Fee $127
Unauthorized Connection to Fire Hydrant $1,000

Facility Charges

Capacity Charges: Capacity charges are assessed for new water service connections or expansions of existing service. These charges help recover a proportionate share of the costs associated with the District’s water system infrastructure, facilities, and assets needed to provide reliable water service and maintain system capacity.

Facility Charge Meter Size Rate
Water Capacity Fees 3/4 in. $15,039
Water Capacity Fees 1 in. $25,065
Water Capacity Fees 1 1/2 in. $50,130
Water Capacity Fees 2 in. $80,208
Water Capacity Fees 3 in. $175,455
Water Capacity Fees 4 in. $315,819
Water Capacity Fees 6 in. $651,690
Water Capacity Fees 8 in. $1,403,640

Installation Charges

Installation Charge Meter Size Rate
Meter Installation ¾ in. $1,000
Meter Installation 1 in. $1,000
Meter Installation 1 ½ in. $1,400
Meter Installation 2 in. $1,600
Meter Installation 3 in. Actual Cost
Meter Installation 4 in. Actual Cost
Service Line Installation 1 - 4 in. Actual Cost
Fire Hydrant Installation -- Actual Cost
Backflow Installation 1 in. $2,800
Backflow Installation 1 ½ in. $3,500
Backflow Installation 2 in. $4,800
Construction Inspection -- 10% of contract
Plan Check -- $50
Fire Flow/Hydraulic Analysis -- $644
RP Bags 1 – 2 in. Actual Cost