Rates
The following rates are in effect as of January 1, 2024:
Tier | Monthly Use (ccf) | Rate |
---|---|---|
Tier 1 | 1-10 | $7.33 |
Tier 2 | 11-29 | $9.67 |
Tier 3 | 30-58 | $13.50 |
Tier 4 | >59 | $17.36 |
Institutional | $15.56 |
Monthly Readiness to Serve Charges
The following rates are in effect as of January 1, 2024:
Meter Size | Rate |
---|---|
¾” | $38.23 |
1” | $49.88 |
1 ½” | $79.00 |
2” | $113.95 |
3” | $195.49 |
4” | $311.98 |
Miscellaneous Fees
Name | Fee |
---|---|
Reconnection Fee | $126 |
Reconnection Fee (after hours) | $558 |
Reestablish Credit Fee | $200 |
Backflow Testing Fee | $188 |
Meter Testing Fee | – |
Will Serve Letter Fee | $127 |
Unauthorized Connection to Fire Hydrant | $1,000 |
Facility Charges
Facility Charge | Meter Size | Rate |
---|---|---|
Storage Fees New | 1 in. | $6,996 |
Storage Fees New | 1 ½ in. | $13,993 |
Storage Fees New | 2 inc. | $22,389 |
Storage Fees New | 3 in. | $44,777 |
Storage Fees New | 4 in. | $69,964 |
Transmission Fees | 1 in. | $10,153 |
Transmission Fees | 1 ½ in. | $20,306 |
Transmission Fees | 2 in. | $32,489 |
Transmission Fees | 3 in. | $64,978 |
Transmission Fees | 4 in. | $101,528 |
Installation Charges
Installation Charge | Meter Size | Rate |
---|---|---|
Meter Installation | ¾ in. | $1,000 |
Meter Installation | 1 in. | $1,000 |
Meter Installation | 1 ½ in. | $1,400 |
Meter Installation | 2 in. | $1,600 |
Meter Installation | 3 in. | Actual Cost |
Meter Installation | 4 in. | Actual Cost |
Service Line Installation | 1 - 4 in. | Actual Cost |
Fire Hydrant Installation | -- | Actual Cost |
Backflow Installation | 1 in. | $2,800 |
Backflow Installation | 1 ½ in. | $3,500 |
Backflow Installation | 2 in. | $4,800 |
Construction Inspection | -- | 10% of contract |
Plan Check | -- | $50 |
Fire Flow/Hydraulic Analysis | -- | $644 |
RP Bags | 1 – 2 in. | Actual Cost |